How have the proposals developed?
Principle and wider connections
As you may know, the site forms part of the emerging H7 allocation in the Regulation 19 Draft Local Plan, which aims to create a brand-new sustainable community that improves local green infrastructure and connections to Pitsea Station.
R2 Danescroft are also working with other developers in the H7 allocation to ensure the delivery of a new community is joined up, rather than as disconnected parcels, and to avoid providing duplicate services for residents.
Highways
The proposals will create a well-connected neighbourhood that supports walking, cycling, public transport and car travel. A clear hierarchy of roads and active travel routes will provide safe and convenient access throughout the development, with two vehicular access points from London Road and additional pedestrian and cycle links to surrounding areas.
Parking is provided within the development and is guided by the Essex Parking Standards. Landscaped verges and swales help integrate transport infrastructure with green infrastructure and sustainable drainage features.
A Transport Assessment will accompany the application, evaluating forecast traffic impacts on the surrounding network, including Sadler’s Farm, London Road and Pound Lane.
Landscaping and ecology
With the reduction in development across the site and through engagement with Natural England, the evolved scheme seeks to provide additional on-site walking routes, off-lead dog walking routes, retention of the existing hedgerows, enhanced landscape screening, and a stronger establishment of a semi-natural character for the open space. The proposals will also result in a minimum of 10% biodiversity net gain (BNG).
Indicative layout
As part of the proposal’s landscape-led approach, the indicative masterplan for the site has evolved significantly since the initial consultation. These changes represent a 28% reduction in the total housing proposed on site.
Working with Basildon Borough Council, Essex County Council, Essex Police, Natural England, and the Essex Quality Review Panel, the overall quantum of development has reduced further to prioritise the proposed public realm and local landscape.
Drainage
Based on current flood mapping, the site lies within Flood Zone 1 and is considered to be at a very low risk of flooding from rivers and the sea.
Nonetheless, R2 Danescroft have ensured that sustainable urban drainage systems will be woven throughout the final design and will mimic how the site currently drains in its undeveloped state.
These drainage features are proposed to include swales (shallow landscaped channels), rain gardens, permeable paving and detention basins. These measures will ensure that water leaves the site no faster than it does today as an undeveloped, greenfield site and reduce the risk of flooding both within the development and in surrounding areas.
The inclusion of sustainable drainage systems on site will also help improve water quality by naturally filtering pollutants from runoff before it is discharged, and boost local biodiversity.
Consultee comments
Basildon Borough Council – working with urban design officers, their feedback directly informed the evolved housing mix, layout, access arrangements and the integration of green infrastructure.
Essex County Council – working with specialist teams, these discussions have informed the emerging development framework, particularly in relation to movement, environmental constraints, infrastructure requirements and the protection of existing site features.
Essex Quality Review Panel – provided constructive feedback on the overall placemaking strategy, landscape-led approach, movement hierarchy and the relationship between built development and open space.
Natural England – engagement focused on the provision of Suitable Alternative Natural Greenspace (SANG) and associated ecological requirements, providing useful feedback to refine walking routes, off-lead dog access, landscape screening and the semi-natural character of the open space.
Essex Police – feedback has informed consideration of emergency access, play areas, landscape design and the treatment of the retained pillbox, with a focus on creating safe, welcoming and well-overlooked environments.
Anglian Water – began early engagement to consult on local infrastructure, drainage and servicing requirements.